A small opening in a glazing frame can be part of the designed drainage route. Its modest size makes it easy to overlook during installation, cleaning or remedial sealing.
Check the system drawing
Identify the intended inlets, collection spaces and outlets for the exact profile arrangement. Ask how the route continues at mullion-transom joints and where water should emerge. Drainage layouts differ between systems, so a familiar-looking extrusion is not enough to establish the detail.
Look before adding sealant
When investigating a leak, compare the installed condition with the approved drainage detail. Record blocked openings, debris and unreviewed sealant. Obtain a designed corrective action before modifying the assembly; sealing an outlet can change the way the system works.
For an inspection checklist, use a marked-up profile section and a location photograph together. They explain what an installer or supervisor must identify. Verify the completed repair through the agreed inspection or testing method. The objective is a functioning water-management route, rather than simply a joint that looks fully sealed.
Reference and further reading
General educational guidance. Use current local requirements, product-specific evidence and competent project assessment for design and construction decisions.